Autumn approaches. I am living away. Ali goes supersonic.
A reminder of the plan for the outside bathroom. The bathroom is now a sizeable 9 square metres.
Joined onto the backside of the bus, entered through the back emergency door through the bus or from outside.
The right hand side plan shows the compost toilet, Storage shelves which open into the room. A large space for the hot water boiler, solar batteries, plumbing and honestly I have no idea what else!
Wooden telegraph posts support the bathroom floor 2 feet off the ground.
Wood reclaimed from various projects and demolition work.
Doors and windows are reclaimed from various skips around Norfolk.
Front outside step is a piece of mahogany from an old Alderman Peel school chemistry desk.
Inside panel structure is covered with waterproof breathable fabric.
Outside wood cover are 8 ft lengths of pallet wood.
I also managed to dissuade the use of creosote as a wood protector.